The sewage system of Petrovac na Mlavi

City Petrovac has built primary and secondary sewage network length of 29 kilometers, which cover about 80% of households.
KJP '' source '' has the technical documentation at the level of the main project, which is processed wastewater treatment center of Petrovac na Mlavi ( 'Hidrosanitas'', in 1978., Belgrade).

However, since these documents were very old, and in the meantime have essentially changed the rules governing this area underwent a new technical documentation in terms of processing existing and newly installed water management terms to the Ministry of Agriculture, Forestry and Water Management no. 325-05-1094 / 92-07 from 16.10.1992. years.
Began in the construction of a wastewater treatment plant and has so far built a plant for mechanical treatment. Continued implementation of this investment depends on securing funding.

The sewerage network does not exist in rural areas, and not in a village not tested the technical possibilities for its construction.
Waste water in the territory of Petrovac na Mlavi controlled National Institute of Public Health in Pozarevac every 10 days.

logo izvor petrovac na mlavi

 gradska cistoca 01

zelenilo 01

gradska cistoca 1

izvoriste setonje 4

izvoriste setonje 1

gradsko zelenilo 6

park 01

izvoriste zdrelo 01

reka vitovnica

manifestacija petrovacnamlavi

reka vitovnica petrovac na mlavi

odrzavanje parka petrovac na mlavi

park 02

odrzavanje parka 01